Saturday, June 19, 2010 @8:11 AM
♥ hot title:New & Old
-Original view 4 square lights (left down) -remaining 2 square lights (right down) -New Conical lights (center)
Wednesday, June 9, 2010 @10:05 AM
♥ hot title:Blk 318 UG Lift B Comissioned & Operational
UG Lift B at 1 storey EL lobby after Comissioning & Operational (Left) UG LIFT B closer range view after turning to AUTO Mode,number pad flash '1 BLOCK 318'(right) UG Lift B outside my unit view after comissioning by ugl premas Lift Technician ( center)
UG Lift B Comissioned on Tue 8 june 2010
@9:55 AM
♥ hot title:Blk 318 UG Lift B before Operational
UG Lift B AT 1 storey EL lobby view after number,button & FL pads re-fixed (left) UG Lift B at 1 storey EL lobby closer range view ,number pad flash '2 MAINTENANCE' (right) UG Lift B outside my unit view before Operational ( center )
Saturday, June 5, 2010 @9:40 AM
♥ hot title:LUP blk 318 ( final section work to 1st storey lobby)
Stage 5 (LEFT) Stage 6 (right)
@9:17 AM
♥ hot title:LUP blk 318 ( final section work to 1st storey lobby 2 )
stage 3 (left) stage 4 )right)
Thursday, June 3, 2010 @3:12 AM
♥ hot title:LUP ( final section ) Blk 318
this 3 images, the left image show the Existing entrance at 6 & 11 storey after re-apply of New identical floor tiles which is dark grey in colour the right image show the 7 storey lobby floor after H & R pour of concrete on ctr portion floor . the ctr image show the same view as the 2nd image but the different is at staircase virw
@3:05 AM
♥ hot title:LUP blk 318 (final section work to 1st storey lobby 1)
this 2 images the left image is my blk 1 storey exist lobby new wall tiles application on sunday 30 may 2010 view the right image is the 2nd view of the exist lobby on mon 31 may 2010
|