Wednesday, April 29, 2009 @8:03 AM
♥ hot title:view of Blk 312 New Lift A
this 2 images are view of in Blk 307-319 LUP on Blk 312 New Lift A before and after operational view Blk 312 New Lift A before floor tiling and operational with a Lift Car partial view (bottom) Blk 312 New Lift A after floor tiling work and operational with it Lift Car light on (top)
@7:43 AM
♥ hot title:Blk 345 Existing Lift A shut down view .
here are 2 images showing Blk 345 Existing Lift A Permanent shut down and it Lift parts after dismantle work . view of Exist Lift A blank numbering pad after it Permanent shut down on 30 march 2009 at 10 storey view (bottom) view of Exist Lift A Lift stystems after it dismantle work (top)
@7:33 AM
♥ hot title:LUP in my estates near my blk
This are the continue from the past 2 posts on Blk 345 . View of Blk 345 New Lift A operational . this the former Existing Lift B before it upgrade
(bottom )
view of Blk 345 New Lift B operational . this the former existing Lift C before it upgrade ( center) view of Blk 345 existing Lift A before it Permanent shut down on 30 mar 2009 ( top)
Wednesday, April 1, 2009 @8:11 AM
♥ hot title:LIFT UPGRADE PROGAMME IN MY BLK PART 1A
here are the continue of 2 more image 1) New number pad for 2-4th or 12 th levels 2) New Numbering panels 3) Blk 315 New Lift A Lift car with lights on but under MAINTENANCE n being barricaded up by a yellow fence . 4) my Blk . Blk 318 New Lifts A & C systems being kept inside a white fence n wooden support makeshift store
@7:05 AM
♥ hot title:LIFT UPGRADE PROGAMME AT MY BLK
below are some images of my blk Future New Lifts that will be serving us at every floor mean from the 1st- 4th or 12th storeys . there will be a total of 3 Lifts after the upgrading work is completed in my blk but nw there r currently only 2 Lifts that are serving my blk they r LIFT A & B which only serve the 1st ,6th & 11th floors and are non-wheelchair accesible & post alot of inconviences . the New Lifts under installation work are New Lifts A & C which are completeing in 2 Qtr 09 i tink between may-june . so after the New Lifts are operational .instead of using "existing" i will use "Old" . The Old Lifts A & B will be upgraded . Old Lift A will be shut down Permanently while Old Lift B will be upgraded to serve every floors . so after the Old Lifts are upgraded . inside the Old Lift shaft there will only be 1 Lift left which is the Future New Lift B while the other part of the Old Lift shaft opening will be seal up n will be left empty , this work will all be completed by 4 Qtr 09 i tink between nov-Dec 2009 so there will be a total of 3 Lift lobbies including the existing lobby n also New tilings n conical lights will be install and also replaces the Old tiltes n fluroscent tubes lights at the first floor only while painting work will be done to the upper floors . THE END OF WORD POST . 1) view of the New Lift after tiling work 2) New first floor only numbering pad (rectangular shape with a yellow fence below ) 3) upper floor Lift call button pad ( 2-4th or 11 th floor ) 4) first floor only Lift call button pad (center)
|