Wednesday, September 17, 2008 @9:01 AM
♥ hot title:last view of part of my old house
below are 3 last view photos of my old house as there was a lack of time n also i was too busy checking for left out stuffs n had no time to take photos of my old house which i had lived from June 1999 - sep 2008 which is 9 years . a) my former bedroom b) Exterior view of my former bedroom,dining room n service balcony windows c) outside view of my main door n lock iron gate . there will be a 4th exterior view photo coming up soon.
Tuesday, September 16, 2008 @8:39 AM
♥ hot title:old furnitures
@8:31 AM
♥ hot title:old furnitures n Electronic Devices n toy n some
@8:24 AM
♥ hot title:old furnitures
these are the photos of the old furntures that i throw on the eve of my move house n the actual day .a) my old Red folding chair, b)my old bed frame upper cupboard /bed top n former writing n computer desk ,c)same with photo b but with abt2 bags of rubbish n the bed top cupboard door had been torn down .
@7:55 AM
♥ hot title:left over view of my old Bed-set
these are the continuing photos of my old Bed-set a)my old Bed frame ,b) the combine view of my 2 part old Bed-set
@7:37 AM
♥ hot title:left over view of my old Bed-set
below are the left over look of my old Bed-set after the dismantling work . a) the left over of my old desk n drawers/cupboard ,b)the left over of the 2 part , c)left over of my old Bed-set
Monday, September 15, 2008 @8:56 AM
♥ hot title:Electric works
these are the photos of the proposed n completed electric works. a)my new wall fans n new showering heater b) old light in my new room .(photo of new light will be posted on another day )
@8:36 AM
♥ hot title:Air-con upgrading work P1C
these are the continuing photos of the New Air-con a)New hoses n metal wrapping sheet .
@8:17 AM
♥ hot title:Air-con upgrading work P1B
these are the photo of the New Air-con n the require parts . a)New Air-con Remote controller ,b)New Air-con c)New condensing unit n supporting structure
@8:08 AM
♥ hot title:Air-con upgrading work P1A
these 3 photos are the continuing photos of the Air-con upgrade . a)old Air-con condensing unit n supporting structure,b)old Air-con Remote controller,c)old Air-con
@7:57 AM
♥ hot title:Air-con upgrading work
these few photos are from the old Air-con n New Air-con . they are the views of the old Air-con n New Air-con . a) ol Air-con woodboard square,b)Air-con installer van ,c)old Air-con wires n hoses pipe d)
Monday, September 1, 2008 @9:34 AM
♥ hot title:New House appointment
finally tomorrow 2 sep 2008 is my New House 2nd appointment . the first appointment was on 28 july 2008 .yeah ! tomorrow take New House keys . whoo !! below are some upcoming events in my New House 3 sep = installation of Air-Con to my House Rooms . 4 sep =changing of the light in my New Bedroom . 5 sep = painting of the whole house . 6 sep = washing of the New House floor n nightime move Altar Table to New House by ah long uncle company lorry . 7 sep = move God of Mercy statue to New House in the early morning , moving some boxes of stuffs to New House in the afternoon . 8 sep = officially move house from 9 AM - 4 PM 9 sep = arrival n delivering of my New Bed-set
|